WBV2-P0-001 Status

status: done task: reconcile_scope_and_checkpoints gate: G0 updated: 2026-08-24 America/New_York

The production queue is now capability-oriented. WBV2-P0-001 is the only ready task and is parented by the new transition baseline. The legacy M16 list remains an immutable coverage lane with M16-GAP-00282 as its checkpoint; its manifests, reports, and generated index are not rewritten as capability evidence.

The control plane reports 6,900 legacy cases, 281 completed coverage records, and three capability clusters covering nine related legacy gaps. Corrective C0-C6 pilots and their Chromium receipts are retained as historical reusable primitives.

All focused plan, ancestry, control-plane, execution-health, task-context, context-governance, execution-control, and diff gates passed with exit code 0. No Blender/WASM startup was attempted for the legacy coverage task because it is not the production lane.

nextTask: WBV2-P0-002