Files
workinf_Blender_Wasm/docs/status/WBV2-P12-005.md
mes123456 ea18416ff2
Some checks failed
M6 deployable RC / quick (push) Has been cancelled
M6 deployable RC / chromium (push) Has been cancelled
M6 deployable RC / release (push) Has been cancelled
Advance WBV2 high-value domains through P13
2026-08-28 07:11:47 +08:00

15 lines
974 B
Markdown

# WBV2-P12-005 status
- task: `WBV2-P12-005`; parent: `WBV2-P12-004`; status: `done`
- engine-bound domain claims: `6`
- P11 claims reused: `3`; P12 new domain claims: `3`
- inventory: `6900` total, `6618` pending, claimed complete: `0`
- repeated Blender/Chromium validation: `0` for existing receipts
- provenance epoch: `2`; release: `AUTHORIZED_REBASELINE_ONLY`; fullHistoricalReproduction: `false`
- nextTask: `NONE`
The domain gate combines the conservative batch ledger with engine-bound Chromium receipts for scene/object, material/animation, and viewport/non-mesh behavior. Existing evidence was reused read-only; only verified domain claims are emitted. The remaining inventory and provenance limitations stay explicit. P12-005 is the terminal pointer until a separately authorized continuation is created.
- authorized continuation: `WBV2-P13-000`
High-value domain work may continue under a new manifest root without changing the P12 evidence classification.