Files
workinf_Blender_Wasm/docs/status/WBV2-P12-005.md
mes123456 ea18416ff2
Some checks failed
M6 deployable RC / quick (push) Has been cancelled
M6 deployable RC / chromium (push) Has been cancelled
M6 deployable RC / release (push) Has been cancelled
Advance WBV2 high-value domains through P13
2026-08-28 07:11:47 +08:00

974 B

WBV2-P12-005 status

  • task: WBV2-P12-005; parent: WBV2-P12-004; status: done
  • engine-bound domain claims: 6
  • P11 claims reused: 3; P12 new domain claims: 3
  • inventory: 6900 total, 6618 pending, claimed complete: 0
  • repeated Blender/Chromium validation: 0 for existing receipts
  • provenance epoch: 2; release: AUTHORIZED_REBASELINE_ONLY; fullHistoricalReproduction: false
  • nextTask: NONE

The domain gate combines the conservative batch ledger with engine-bound Chromium receipts for scene/object, material/animation, and viewport/non-mesh behavior. Existing evidence was reused read-only; only verified domain claims are emitted. The remaining inventory and provenance limitations stay explicit. P12-005 is the terminal pointer until a separately authorized continuation is created.

  • authorized continuation: WBV2-P13-000

High-value domain work may continue under a new manifest root without changing the P12 evidence classification.