37 lines
2.2 KiB
Markdown
37 lines
2.2 KiB
Markdown
# Unattended Acceptance Progress
|
|
|
|
Snapshot: 2026-09-16 17:24 Asia/Shanghai. The current audit accepts 172 of 1508
|
|
requirements. All 172 declared executable requirements have current passing
|
|
evidence. Another 1336 requirements still lack executable coverage; their
|
|
historical failures and stale receipts remain visible. The full task is incomplete.
|
|
|
|
This continuation added three requirements: the two Part document-view service
|
|
endpoints and `Part_CheckGeometry`, with 45 scenario records in their dedicated
|
|
cases. These are three business requirements, not 45 new requirements.
|
|
|
|
Fixed malformed-request errors discarding healthy Part Workers/documents, and
|
|
native BOP analysis waiting for new pthreads during a synchronous WASM call.
|
|
Geometry inspection now reports actual BREP/BOP issues for multiple selected
|
|
objects, preserves dirty geometry and history, and works through the mounted
|
|
task on desktop/mobile. See `PART_VIEW_SERVICE_PROGRESS.md` and
|
|
`PART_CHECK_GEOMETRY_PROGRESS.md` for detailed evidence and limits.
|
|
|
|
Current regression evidence passed Part (29), Import (6), PartDesign (23),
|
|
TechDraw (5) and Web (20). Other unchanged proofs, including the semantic IFC
|
|
supplement, were retained. The final three-ID reuse check read two reports in
|
|
0.182 seconds and executed zero cases or WASM loads. Production assets were
|
|
synchronized before the final Web run. TypeScript, native incremental builds,
|
|
geometry ownership checks, router tests and nine continuous-planner tests passed.
|
|
|
|
Efficiency changes reserve uncovered development after two refresh-only batches,
|
|
limit full IFC semantic instructions to relevant batches, and archive outdated
|
|
Part boundary notes without altering executable configurations or assertions.
|
|
Build affected native owners, synchronize public assets, then build the frontend
|
|
before accepting production workflows; changing production assets afterward
|
|
invalidates otherwise recent browser proof.
|
|
|
|
The existing `freecad-web-acceptance.service` resumes serial development.
|
|
Read `freecad-web-scheduler-status.json` for its live state and
|
|
`web-business-completion-audit.json` for current acceptance. Service activity and
|
|
cycle count are not evidence of business completion.
|