Files
workinf_Blender_Wasm/docs/status/WBV2-P10-003.md
mes123456 f18f80d0b9
Some checks failed
M6 deployable RC / quick (push) Has been cancelled
M6 deployable RC / chromium (push) Has been cancelled
M6 deployable RC / release (push) Has been cancelled
Continue WBV2 module parity through P11
2026-08-28 05:50:14 +08:00

946 B

WBV2-P10-003 status

  • task: WBV2-P10-003; parent: WBV2-P10-002; status: done
  • module cases: 9; positive Main mutations: 3; retained negatives: 6
  • shards: 2; one catalog hash; exit codes: 0/0
  • inventory: 6900 total, 6900 explicitly remaining; no false completion claim
  • nextTask: NONE

The data-driven Mesh, Modifier, and Asset Catalog matrix re-runs the real WebEngine WASM Main path with one catalog hash. Positive cases change Main and pass save/reopen; stale, malformed, unknown, and collision cases remain explicit retained negatives. The matrix does not claim all inventory entries are complete or reproduce unavailable historical bytes. P10-003 is the terminal pointer until a separately authorized continuation is created.

  • authorized continuation: WBV2-P11-000

Module expansion may continue under a new manifest root. This does not change the P10 evidence or the authorized-rebaseline-only release scope.