Files
workinf_Blender_Wasm/docs/status/WBV2-P1-004.md
mes123456 c2c65d3a09
Some checks failed
M6 deployable RC / quick (push) Has been cancelled
M6 deployable RC / chromium (push) Has been cancelled
M6 deployable RC / release (push) Has been cancelled
Rebuild local Blender WASM environment and recovery evidence
2026-08-27 20:22:15 +08:00

1.4 KiB

WBV2-P1-004 Status

status: done task: WBV2-P1-004 gate: G1 updated: 2026-08-25 America/New_York

The worker lifecycle fixture exposes a bounded cancellation/restart/dispose contract through the Blender Text datablock and the WASM SceneIR reader. Desktop and WASM agree that cancelled opens publish no result, stale results from generation 1 are rejected after restart to generation 2, and CPU/WASM/GPU owner counters return to zero after cancel, restart, and dispose. The future extension field and schema hash survive a compressed save/reopen cycle.

Acceptance evidence:

  • fixture generator exit: 0
  • desktop lifecycle contract read and save/reopen exit: 0
  • npm --prefix web run test:generated-gap -- --task WBV2-P1-004 exit: 0
  • node tools/web/check-generated-gap.mjs --task WBV2-P1-004 exit: 0
  • malformed blend keeps the original Main snapshot unchanged
  • hash drift, cancellation, generation mismatch, and double-dispose outcomes are represented in the bounded lifecycle receipt

Artifacts:

  • report: tests/golden/WBV2-P1-004/worker-lifecycle-report.json
  • desktop report: tests/golden/WBV2-P1-004/worker-lifecycle-desktop-report.json
  • command log: tests/golden/WBV2-P1-004/command.log
  • WASM build log: tests/golden/WBV2-P1-004/wasm-build.log
  • fixture SHA-256: c17cf938451b7bdbcda9a04b1e6436f217269e3167804cc785fd0d32e2d9d4bb
  • saved lifecycle contract hash: 4567145720b21ffab0202d82584bc5ef41a829bc6a1be13683c35ed0115345ac

nextTask: WBV2-P1-005