300 B
300 B
WBV2-P8-001 status
- task:
WBV2-P8-001; parent:WBV2-P8-000; status:done - nextTask:
WBV2-P8-002
The WBV2 drift is limited to the mutable execution plan. The npm dependency graph and lockfile are unchanged; only package scripts changed. Historical P0 and M13 manifests remain untouched.